Nazareth Light Rail Ha'Histadrut Bridge

BRIDGE 06-C7 LRT HAYFA NAZARETH
The bridge length is 354 meters and carries two LRT tracks.
The site location is near a fault rupture zone and may suffer significant damage due to the combined effects of ground shaking and surface rupture. The energy dissipation and seismic isolation is done by Lead Rubber Bearings.
7 different accelerograms based on recorded earthquakes were provided by Amos Shiran and the seismic analysis was done by AVIDAN Engineers.
Client: TransIsrael - חוצה ישראל
Contractor: Minrav Group Ltd.
Seismic design: AVIDAN Engineers